Many corporate customers are puzzled whether the electrical equipment purchased with a valid and genuine explosion-proof certificate can be used normally after installation?

Of course not!


Does the use of explosion-proof equipment here equal the issue of overall explosion-proof?


We know that every product has its lifecycle, from production, market launch, end user use, loss to extinction. Explosion proof equipment, as a special equipment in a special industry, its lifecycle not only depends on the product itself, but also on the installation method, maintenance methods, etc. In reality, it often occursZhongnuo TestingDue to improper use by users, explosion-proof electrical equipment may fail to explode and cause explosion accidents, which is very alarming.


Therefore,The installation acceptance of newly put into use explosion-proof equipment is particularly necessary and important.


After the installation of explosion-proof equipment, an inspection agency with national testing and inspection qualifications should be commissioned for initial inspection before the project is handed over to the user to ensure the explosion-proof safety performance of the entire project.The explosion-proof acceptance standards are based on mandatory national standards such as AQ 3009, GB/T3836.15, GB/T3836.16, and GB 50257.

After the installation and acceptance of explosion-proof equipment, it is not a one-time solution.To ensure that explosion-proof equipment is in good working condition and can be safely used in hazardous areas for a long time,Continuous supervision and regular inspection of explosion-proof equipment in use must also be carried out.

Continuous supervision should be carried out by professional personnel of the enterprise, and corresponding inspection records should be kept to promptly handle any abnormal phenomena.


Regular inspections should be entrusted to inspection institutions with national testing and inspection qualifications,The time interval generally does not exceed 3 years.Enterprises should take timely explosion-proof rectification measures based on the items that do not meet the inspection requirements, and file the inspection reports and rectification results of third-party qualification institutions with the safety production supervision and management department.


Safety is nothing! Explosion proof cannot be relaxed!


Original article, plagiarism and reprinting are strictly prohibited!


Related Recommendations
Contact us
400-862-6488
Address: 12th Floor, Research and Development Building, Yanxiang Zhigu, No. 11 Gaoxin West Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粤ICP备18004888号
服务热线
18924609560
点击这里给我发消息 在线咨询
点击这里给我发消息 在线咨询