Scan code consultation:
400-862-6488
Service
Service
Current location: Home Service ATEX&IECEx ATEX certification
What documents should be prepared for ATEX certified factory audits?

SINO Testing Services

| 2020-09-28|Return

ATEX is named after the French word "ATmosph è resExhibitibles".

Manufacturers of equipment intended for use in potentially explosive hazardous environments, applicationATEXThe directive clause and the CE mark are attached, and its explosion-proof equipment can be sold anywhere in Europe without considering other requirements.

The scope of equipment applicable to this directive is particularly broad, roughly including equipment suitable for fixed offshore platforms, petrochemical plants, flour mills, and other potentially explosive environments.


Europe thoroughly revised the existing explosion-proof directive ATEX 94/9/EC on February 26, 2014, and the new ATEX directive 2014/34/EC was enforced on April 20, 2016.

ATEX instructionApplicable to all electrical and mechanical equipment, components, protective systems, and special safety, control, and regulating devices used or potentially used in potentially explosive environments, as well as those produced or sold in the European Union, including equipment and protective systems used on surfaces or mining areas.

 

ATEX implements the EN60079 standard, which is commonly used in the EU market.

For products used in Zone 0 and Zone 1, in addition to type testing (according to the BS EN IEC 60079 series standard), factory inspections must be conducted to obtain QAN reports, based on the BS EN ISO/IEC 80079-34 standard; And accept regular supervision and review.

 

What documents do ATEX certified factories need to prepare for inspection?

1. Records of differences in laws, regulations, and standards comparison

2. Quality document information

3. Communication record of explosion-proof authorization appointment letter

4. Customer orders

5. Contract review records

6. Personnel training records

7. Product Design and R&D Change Order

8. Product Inspection Record

9. Production tracking form

10. Equipment calibration and verification certificate

11. Subcontracting orders, delivery notes, and other document records



The copyright of this article belongs to Zhongnuo Testing. The right to pursue plagiarism and theft will be reserved. When reprinting, please indicate the source of the original text.

 


Related Recommendations
Contact us
400-862-6488
Address: 12th Floor, Research and Development Building, Yanxiang Zhigu, No. 11 Gaoxin West Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粤ICP备18004888号
服务热线
18924609560
点击这里给我发消息 在线咨询
点击这里给我发消息 在线咨询